![]() 02/06/2016 at 00:42 • Filed to: Home improvement | ![]() | ![]() |
Extreme progress! 75% of the room is done. Now for lots of little pieces for the large notch and the doorway. And at some point basemolding. My dad was a great help today. He basically laughed while I cursed for five hours and bought me Wendy’s. Love him.
![]() 02/06/2016 at 00:55 |
|
All you need afterwards is some bitchin’ molding.
![]() 02/06/2016 at 00:58 |
|
awesome. Also whats good at wendys these days.
![]() 02/06/2016 at 01:01 |
|
![]() 02/06/2016 at 01:15 |
|
And kebabs
![]() 02/06/2016 at 01:18 |
|
![]() 02/06/2016 at 01:28 |
|
Hard to say. I got the Baconator, which is really delicious when you’re not paying for it. Also a Frosty. Expensive as fuck menu.
![]() 02/06/2016 at 01:29 |
|
I would have signed up for that
![]() 02/06/2016 at 01:30 |
|
Does the stuff have a pretty convincing look and level out ok? My father-in-law just installed some that looks decent, but I’ve seen other half-assed jobs that looked like hell and creaked with every step. I’m thinking about laying some in where the old linoleum is failing in my kitchen.
![]() 02/06/2016 at 01:31 |
|
I know what I'm doing now.
![]() 02/06/2016 at 01:59 |
|
Doesn’t creak at all which is nice, but while the surfaces are durable, the little channels and bits that lock in on install are fragile. Damage the tang in just the wrong spot, it will never be flush with adjacent pieces. I have one major touch up spot to do. But now I know.
![]() 02/06/2016 at 02:18 |
|
That’s some beautiful flooring (guessing laminate?). “Nice work!”, to you and your Dad.
![]() 02/06/2016 at 10:28 |
|
Thanks, good to know.